Voltage Park
US neocloud selling on-demand and reserved bare-metal NVIDIA HGX H100 clusters from $1.99/hr; acquired TensorDock (2025) and merged with Lightning AI (Jan 2026).
Short answer: Start with one minimum contract, verify the pool worker and the on-chain payout, then scale. The first payout is the cheapest possible lesson this market sells - and the only one that cannot be faked at you.
providers on this page: 43 · status active: 81% · facts verified by us: 65% · publish independent proof: 7%
quick picks
US neocloud selling on-demand and reserved bare-metal NVIDIA HGX H100 clusters from $1.99/hr; acquired TensorDock (2025) and merged with Lightning AI (Jan 2026).
Distributed consumer-GPU cloud with published per-second prices and measured host earn rates; no token, fiat only.
Established US GPU cloud: on-demand H100/B200 instances, 1-Click Clusters and Superclusters, billed per minute with no ingress/egress charges.
Open permissionless marketplace for containerised GPU/CPU compute; providers bid, tenants pay per block.
Centralized open-model inference and GPU-cluster provider with published per-token and per-GPU rates; fiat-only and not decentralized.
Developer GPU cloud with published per-second rates across Community and Secure Cloud, plus serverless endpoints and clusters.
US (Delaware) marketplace for aggregated on-demand GPU instances and token-priced hosted RL training/inference, with an open-source AI research profile.
Host-set GPU marketplace with per-second billing; on-demand, interruptible and reserved tiers, plus serverless and clusters.
Decentralised GPU rendering and generative-AI media marketplace; job/frame-priced, not a raw GPU-hour cloud.
Privacy-first inference platform (text/image/video/audio) with TEE/E2EE modes, subscription tiers and USDC/x402 crypto payment; not GPU rental.
Serverless AI inference on Bittensor subnet 64 with an OpenAI-compatible API, public per-1M-token pricing and attestable TEE compute.
Centralized GPU cloud built on the company's own GPU-virtualisation layer: cheap per-minute A100/L40/H100/A6000 instances; no crypto, no token.
US curated GPU cloud and OpenAI-compatible inference; H100 $3.19/hr, H200 $3.99/hr on-demand with hourly billing and $5 never-expiring credits.
Decentralised GPU marketplace on Bittensor subnet 51: pods with SSH on provider machines, billed per second with no minimum; CLI, SDK, API and MCP tooling.
Decentralized confidential-computing toolkit: tasks run in Intel TDX enclaves with on-chain proof, paid in RLC.
Decentralized cloud (VPS, GPU instances, storage, confidential VMs) on a node network; paid via ALEPH/USDC/card credits.
Singapore-run GPU aggregator reselling capacity from 5+ neoclouds; H100 from $2.64/hr on-demand, per-minute billing.
AntPool's prepaid fixed-term cloud-hashrate product (S19 XP BTC packages): pay the hashrate fee up front, electricity is deducted daily from output; the only live SKU was sold out.
Permissionless GPU cloud and per-token LLM inference (now ASI:Cloud); wallet login, no KYC, crypto only.
Verifiable-AI network on an OP-Stack L2: information markets, REE verification and $AI - no GPU rental.
Hybrid cloud+edge GPU marketplace with cheap consumer-GPU rates (RTX 3090 $0.14/hr, A100 $1.99/hr) and TFUEL-linked node rewards; cloud-launched in 2024. Facing an LA lawsuit alleging fraud/token manipulation.
Solana-based self-serve GPU marketplace for AI inference, CI and agent workloads; live price table, consumer-GPU supply.
Decentralized AI inference network: models compete to produce predictions; consumers query signed inferences via REST/SDK.
Cosmos-SDK L1 for decentralized open-weight LLM inference; hosts earn GNK, developers use OpenAI-compatible brokers.
Swiss-DAO multi-provider neocloud; H200 from $2.80/hr with zero egress, but Console access is still gated to an Alpha VM testing program and top-ups run only in USDC via CopperX.
Nasdaq-listed Bitcoin miner selling short-dated Cloud Hash Rate plans with separate per-T hash-rate and electricity fees.
Swiss pioneer (2016) of decentralized CPU-first compute; provider-set GLM prices, developer SDKs, and a GPU provider programme that remains in beta since 2022.
Nasdaq-listed, Bitmain-backed Singapore operator selling BTC cloud mining, miner rental and miner co-hosting.
A network of subnets producing digital commodities and paid in TAO - not a GPU-rental market; buyers rent compute indirectly via subnet apps such as Chutes (subnet 64).
Local miner + pool relay that auto-converts your own hardware's mining rewards into 82 payout assets for a 1% fee (0.75% with a referral code); not cloud mining.
Solana-based aggregated GPU/CPU network: clusters, VMs, containers, inference, and Intel TDX confidential compute.
KuCoin-operated cloud hashrate (BTC, DOGE+LTC, ZEC, KAS) on 7-360 day contracts with mine-first-pay-electricity-later; capacity and returns are unaudited operator claims.
Decentralized, MOR-token AI inference network (OpenAI-compatible, TEE-backed providers) with no company, no fiat, and no published price table.
Funded UAE/ADGM company that pivoted from GPU cloud to a governed 'private AI' platform; no public GPU pricing.
Distributed enterprise/gaming GPU cloud (Aethir Earth for AI, Aethir Atmosphere for cloud gaming) with staking and slashing.
Tokenised 'digital miner' hashrate NFTs with daily BTC rewards, resale on a marketplace and GOMINING-token fee discounts.
Legacy GPU-mining software (CudoMiner/CudoFarm/CudoOS) with 1.5-6.5% commission pricing; the parent has pivoted to enterprise AI GPU infrastructure and the mining product looks unmaintained.
Confidential-inference protocol - site/dashboard/API ALL DEAD; docs self-contradictory. Drop to dead if still dark next cycle.
Armenian-operated BTC cloud contracts and hosted-ASIC ownership from $99, with a daily service fee and terms up to 60 months.
Permissionless peer-to-peer GPU marketplace paying in crypto, with on-demand and biddable spot tiers and no disclosed legal entity.
Tokenised enterprise-GPU compute project (GB200/H100/H200/RTX 5090 claims) with a JS-only site, no public pricing and no disclosed legal entity.
DePIN cloud with a FluxEdge GPU marketplace; its UK operator entered administration on 4 September 2026.
Long-running Irish-registered BTC hashrate contracts with a contract trading room; US residents are blocked.
Most "beginner guide" content in this market teaches you what to click; almost none teaches you how to avoid paying the learning tax - the 30-80% of first positions that this market extracts from newcomers in failed operators, overpriced contracts, and faked hashrate. This page compresses that lesson into one repeatable method.
The method is four steps, and the order matters:
At today's hashprice (n/a per TH/day), one terahash earns about four cents of gross revenue daily. Any contract fee near that number eats the entire revenue. This is why "cheap per-TH" offers with fat maintenance fees dominate this market's scam pattern - the fee is where the seller's margin lives [1]. Price every offer in the mining calculator with a difficulty-growth assumption you believe; never with the operator's projection.
| Provider | From | Unit | Term | Maint. | Proof | Score |
|---|---|---|---|---|---|---|
| Voltage Park | $1.99 per GPU/hr | per GPU/hr | n/a | n/a | no | 7.8 |
| Salad / SaladCloud | $0.015 per GPU/hr | per GPU/hr | n/a | n/a | no | 7.5 |
| Lambda (Lambda Labs) | $0.690 per GPU/hr | per GPU/hr | n/a | n/a | no | 7.3 |
| Akash Network | $0.090 per GPU/hr | per GPU/hr | n/a | n/a | partial | 7.2 |
| Together AI | $1.99 per GPU/hr | per GPU/hr | n/a | n/a | no | 7.1 |
| Runpod | $0.160 per GPU/hr | per GPU/hr | n/a | n/a | no | 7 |
| Prime Intellect | $0.470 per GPU/hr | per GPU/hr | n/a | n/a | no | 6.9 |
| Vast.ai | $0.067 per GPU/hr | per GPU/hr | n/a | n/a | partial | 6.9 |
| Render Network | n/a | n/a | n/a | partial | 6.8 | |
| Venice AI | n/a | n/a | n/a | partial | 6.8 | |
| Chutes (Bittensor subnet) | $0.025 per GPU/hr | per GPU/hr | n/a | n/a | yes | 6.7 |
| Thunder Compute | $0.350 per GPU/hr | per GPU/hr | n/a | n/a | no | 6.7 |
| Hyperbolic | $3.19 per GPU/hr | per GPU/hr | n/a | n/a | no | 6.6 |
| Lium | $0.160 per GPU/hr | per GPU/hr | n/a | n/a | partial | 6.6 |
| iExec | n/a | n/a | n/a | yes | 6.3 | |
| Aleph Cloud (Aleph.im) | $0.055 per GPU/hr | per GPU/hr | n/a | n/a | partial | 6.2 |
| Spheron Network | $0.480 per GPU/hr | per GPU/hr | n/a | n/a | no | 6.2 |
| Antpool (cloud mining) | n/a | per TH/s/day | 150 d | n/a | partial | 6.1 |
| CUDOS | n/a | n/a | n/a | no | 6.1 | |
| Gensyn | n/a | n/a | n/a | yes | 6.1 | |
| Theta EdgeCloud | $0.050 per GPU/hr | per GPU/hr | n/a | n/a | partial | 6.1 |
| Nosana | $0.048 per GPU/hr | per GPU/hr | n/a | n/a | no | 6 |
| Allora | n/a | n/a | n/a | partial | 5.8 | |
| Gonka (Gonka.ai) | n/a | n/a | n/a | partial | 5.8 | |
| Fluence | $2.80 per GPU/hr | per GPU/hr | n/a | n/a | partial | 5.7 |
| Bitdeer Technologies Group | $0.056 per TH/s/day | per TH/s/day | 30 d | n/a | partial | 5.6 |
| Golem Network | n/a | n/a | n/a | partial | 5.4 | |
| BitFuFu Inc. | $0.015 per TH/s/day hashrate fee (June 2026 example; service fee extra) | per TH/s/day hashrate fee (June 2026 example; service fee extra) | n/a | n/a | partial | 5.3 |
| Bittensor | n/a | n/a | n/a | partial | 5.3 | |
| Unmineable | n/a | n/a | n/a | partial | 5.3 | |
| io.net | n/a | n/a | n/a | partial | 5.3 | |
| KuMining | $0.030 per TH/s/day hash fee (BTC; public API) | per TH/s/day hash fee (BTC; public API) | 7 d | n/a | partial | 5.1 |
| Morpheus | n/a | n/a | n/a | partial | 5.1 | |
| NodeShift | n/a | 365 d | n/a | unknown | 5.1 | |
| Aethir | n/a | n/a | n/a | partial | 5 | |
| GoMining | $12.99 per digital miner (one-off purchase) | per digital miner (one-off purchase) | n/a | n/a | partial | 5 |
| Cudo (CudoMiner) | $0 commission on mined output | commission on mined output | n/a | n/a | no | 4.9 |
| Atoma | n/a | n/a | n/a | partial | 4.6 | |
| ECOS (ECOS-M) | $99 per contract | per contract | 1830 d | n/a | no | 4.6 |
| Clore.ai | $0.027 per GPU/hr | per GPU/hr | n/a | n/a | partial | 4.4 |
| Exabits | n/a | n/a | n/a | unknown | 4 | |
| Flux | n/a | n/a | n/a | no | 4 | |
| Hashing24 | $0.330 per MH/s (3-24 month DOGE/LTC contract) | per MH/s (3-24 month DOGE/LTC contract) | 90 d | n/a | no | 3.6 |
Live from our database - caveats and sources in each linked review.
A fourth one deserves its own line: buying the story instead of the economics. "Next-gen datacenter", "green energy powered", "mining since 2017" - none of it is a cash flow. The only inputs that matter are price, fee, term, and hashprice [1]; everything else is either documented in the columns above or it is decoration. Story-based buying is also how experienced people lose money here - familiarity with the jargon is not the same as pricing the contract, and the scams checklist exists because experienced buyers get taken too.
What the method looks like on a small budget [3]:
Where the numbers come from: our methodology documents how hashprice is built from public network data, and every figure in the strip above traces to it [4]. No operator projection on this page is taken at face value - the same discipline your own verification applies [5].
The archive currently documents 25 failed or fraudulent operators - almost all of them would have passed a dashboard screenshot test and failed the pool-worker test. That asymmetry is the whole method: 65% of the 43 live rows here carry facts we verified ourselves; the rest are documented-but-unverified, and your own exit test is what closes that gap. Median minimum purchase across the population is $7.50 - small enough that the method costs you a test, not a lesson in ruin.
One minimum contract, verify the pool worker under your control, verify the payout on-chain, then scale. The order matters - each step is evidence, and any failure is a stop.
The minimum the operator sells, in the coin you actually want. Not the recommended bundle - the minimum exists for testing and the upsell exists because it works.
A pool worker under your control - your account, your address, your rejected-share count. Balance counters are marketing; a pool worker is data.
At the current hashprice in the strip above, roughly four cents of gross revenue per day before any operator cut. Every fee near that number is eating your entire revenue - which is why the calculator exists.
Contract for the smallest learning loop - one operator, one payout. Hosting if you want machines you own, with the retrieval clause read before you buy hardware.
Spot - day-to-day rentals cap your worst case at a day's rent. Contracts lock a term, and the term is where beginners pay the learning tax.
One you can reach inside the contract term. If the threshold exceeds your term's earnings, the unclaimed balance is the operator's - ask what happens to it before buying.
Every row in our table carries a data-quality flag and sources with access dates. Verified means we checked it ourselves; read the methodology before trusting the badge.
Starting with the biggest suggested position, trusting dashboards over pool workers, and ignoring the exit. All three are covered on this page.
Only after the full loop - order, worker, payout - has passed once. Averaging into a failing operator is the most expensive mistake in this market.