Voltage Park
US neocloud selling on-demand and reserved bare-metal NVIDIA HGX H100 clusters from $1.99/hr; acquired TensorDock (2025) and merged with Lightning AI (Jan 2026).
A genuinely long-running DePIN cloud with a live GPU marketplace, but its UK operating company entered administration on 2026-09-04, it publishes no verifiable GPU pricing, and FluxEdge deposits are non-refundable and non-withdrawable, so prepaid balances now carry counterparty risk.
site reachable · checked 11 h ago · daily check
by the bestcloudmining editorial desk · curated review · prose updated 2026-10-02 · facts as of 2026-10-02 · how we verify
Flux markets a decentralized cloud of user-operated nodes (6,623 claimed in 67 countries) with a GPU marketplace called FluxEdge [1]. The product pages keep publishing - but the UK operating company behind it, InFlux Technologies Limited, entered administration on September 4, 2026, sold the business the same day, and discloses none of this anywhere on its web properties [3][4][5]. That gap is why it stays on watch.
GPU compute via FluxEdge - "a decentralized marketplace for GPU compute resources, connecting users who need computational power with providers offering underutilized hardware" [6]. There is no public GPU price table; the docs cite capacity figures that are explicitly stale ("As of 2025") [7]. The claimed 15,157 GPUs and node-network statistics are self-published and unaudited [7]. A "Direct Compute Services" rental product is still labelled "Available Soon!" [7]. You deposit, bid, and spend - under the terms below.
The binding flaw: FluxEdge deposits are non-withdrawable - "Any deposited amount must be spent. Withdrawals are not possible" - and "No refunds are available" [2]. The terms are governed by Swiss law [1], while the UK operating entity is in administration with a pre-pack sale to a presumed connected party [4][5]. There is no published pricing to hold anyone to [7]. KYC policy: not published on the pages we could verify [7].
The node-network numbers are the operator's own counters (6,623 nodes, 54.1K cores, 3PB SSD) [1]; the FluxEdge capacity figures are self-labelled "As of 2025" [7]. What verifies independently: the blog kept publishing [8]; the corporate record - Companies House shows the administration, the administrators' names, the same-day sale, and the US parent's January 2026 takeover of control [3][4][5]. What the operator's own site hides: any mention of administration, FRP Advisory, or insolvency - zero matches across the pages we grepped [5].
The company entered administration on September 4, 2026, with FRP Advisory appointed as joint administrators [3]; their proposals document a pre-pack sale of business and assets effected the same day, flagged under regulation 9(5) for connected-party sales [4]. The US parent became the person with significant control on January 31, 2026, replacing the founders [4]. Publishing continued throughout - a "New FluxCloud" post ran September 25 [8], and a waste-to-energy data-center MOU made the trade press in early September [9]. We found no community discussion [10] and no press coverage of the insolvency itself [11] - the story exists only in the UK filings [5].
No published GPU price table - FluxEdge shows capacity claims only [7]. Deposits are top-up accounts that must be spent, with no refunds and no withdrawals [2]. FLUX trades at about 7.5 cents with a 31.5-million-dollar market cap [10]. Swiss law governs the terms [3]. The "Direct Compute" rental product remains "Available Soon!" [7].
Flux is the most corporate-risk-flagged live entry on our compute list: a functioning marketplace and active community on top of an operating company in administration, sold same-day in a connected-party deal, with a no-withdrawal deposit system still taking money [2][4][5]. If you use FluxEdge anyway, deposit only what you will spend immediately - the balance is not yours back [2] - and treat every capacity claim as unaudited [1].
| Documented price | see provider site |
|---|---|
| Notes | No public GPU $/hr table. FluxEdge shows price per hour (plus possible one-time startup fee) only after selecting GPU/specs/location/duration in the console. Marketing claims 'up to 90% cheaper than AWS/GCP' and 'no egress charges' are unverified. Price omitted because it cannot be verified. |
Run the long math before paying: cloud mining calculator →
Built only from what is documented on this page as of 2026-10-02 - anything not documented stays a gap on purpose.
Everything happens on runonflux.com - we count the click, nothing else changes for you.
Documented level: optional - Premium (H100/A100/Blackwell) machines require account level KYC1, unlocked by making a fiat deposit via Stripe or PayPal. Register before you pay.
Accepted: FLUX plus card transfer. Check the network and the deposit address inside your account, never from an email.
maintenance · refund: No refunds and no withdrawals: 'If I deposit money on FluxEdge, can I withdraw it? No... A term you did not read is money you cannot get back.
No independent proof is documented. Withdraw the first payout early and compare it with the pool worker or your own wallet.
Then run the math: mining calculator · contract vs. HODL · all GPU compute providers.
Short answer: Based on our checks as of 2026-10-02: Flux scores 4/10 in our weighted review. We logged 2 red flags (listed above). Facts are reported, not fully verified - test with a small purchase and a withdrawal first. Current status: watch - A genuinely long-running DePIN cloud with a live GPU marketplace, but its UK operating company entered administration on 2026-09-04, it publishes no verifiable GPU pricing, and FluxEdge deposits are non-refundable and non-withdrawable, so prepaid balances now carry counterparty risk. User reports and operator background are documented with dated sources in the meta-review below.
| Status | watch |
|---|---|
| Operator | InFlux Technologies Limited (Flux) · HQ United Kingdom (high) |
| Founded | 2019 |
| Proof | none published |
| KYC | optional |
A real, operating provider can still lose you money: with a contract you own no hardware, revenue follows coin price and difficulty, and most published contracts are priced so the seller comes out ahead. "Legit" means the operator exists and pays what its terms promise - not that the deal is profitable. 15 dated sources back this page; they are listed under sources.
Same category, scored on the same criteria - so the comparison stays honest. Compare only in the same unit, and read the minimum, KYC and proof columns before switching.
US neocloud selling on-demand and reserved bare-metal NVIDIA HGX H100 clusters from $1.99/hr; acquired TensorDock (2025) and merged with Lightning AI (Jan 2026).
Distributed consumer-GPU cloud with published per-second prices and measured host earn rates; no token, fiat only.
Established US GPU cloud: on-demand H100/B200 instances, 1-Click Clusters and Superclusters, billed per minute with no ingress/egress charges.
Open permissionless marketplace for containerised GPU/CPU compute; providers bid, tenants pay per block.
Ready to try Flux? Start small, verify one payout, and only scale up once the hashrate or compute actually matches what you paid for.
Based on our checks as of 2026-10-02: Flux scores 4/10 in our weighted review. We logged 2 red flags (listed above). Facts are reported, not fully verified - test with a small purchase and a withdrawal first. Current status: watch - A genuinely long-running DePIN cloud with a live GPU marketplace, but its UK operating company entered administration on 2026-09-04, it publishes no verifiable GPU pricing, and FluxEdge deposits are non-refundable and non-withdrawable, so prepaid balances now carry counterparty risk. User reports and operator background are documented with dated sources in the meta-review below.
No comments yet - be the first. Posting runs a short proof-of-work in your browser (anti-spam), no account needed.